Период работ: Ноябрь- Декабрь 2008 г.
Объект: г. Мурманск, Торгово - Развлекательный комплекс.
Выполняемые работы: Вибропогружение ж/б свай. |
|
|
There are no translations available.
Период работ: Ноябрь 2008 г.
Объект: Тульская обл. г Новомосковск, Завод минеральных удобрений.
Выполняемые работы: Забивка ж/б свай. |
|
Period of works: July 2008
Project: Construction and reconstruction of the clinicosurgical comlex of research institute of transplantology and artificial organs in Moscow (building 6).
Address: Moscow, Schukinskaya str, 1
Performed works: Making of foundation pit’s sheet pile shoring out of the pipes 325 mm. in diameter, 11.4 m in length. |
|
Read more...
|
|
Period of works: May-july 2008
Project: Construction of the dwelling house and outbuildings.
Address: Moscow region, Pushkinskii district, town Tsherkisovo
Performed works: Driving of the concrete piles with pile driver with diesel hammer. |
|
Read more...
|
|
Period of works: December 2007, june 2008
Project: Construction of housing and garage complex.
Address: Altufevskoe str.,77
Performed works: Making of foundation pit’s sheet pile shoring out of the pipes 325 mm. in diameter, 9-12 m in length. |
|
Read more...
|
|
Period of works: May-june 2008
Project: Construction of the building of airterminal complex “Domodedovo”.
Address: Moscow region, Domodedovo district, “Domodedovo”
Performed works: Piling of the root piles 250 mm in diameter. |
|
Read more...
|
|
Period of works: November 2007
Project: Construction of monolithic 22-24-floor dwelling house.
Address: c. Moscow, ЮЗАО district, Lomonosovskii block 18, 4.
Performed works: Jacking of concrete pile 7-9 m. in length. |
|
|
|
|
|